3 Simultaneities
Environment protection facilities should be designed, constructed and put into application simultaneously with the main project, so as to effectively administer and prevent pollution.
The Constitution And Budget Of Environment Scheme
Basing on the important environment elements and the company¡¯s financial and technical status, the environment aims, indexes and measures of realization is constituted; The expenses of implementation is budgeted and insured; The person with responsibility is assigned; thus the scheme is positively implemented.
The Constitution And Drilling Of Emergency Scheme
Potential emergent accident is evaluated and corresponding emergency scheme is constituted and drilled simultaneously.
Guideline Of Prevention Priority Is Carried Through
Before a production project is putting into production, the environment is evaluated for reducing and preventing pollution. Techniques and equipments are selected and put into production from the perspective of clean manufacturing.
Active Administer
By capital investing for constructing excellent pollution disposal facilities, pollution is actively administered and let off without fail at meeting the standard.
|